<strong>Condit</strong> <strong>Dam</strong> Hydroelectric Project<br />
Final Supplemental EIS<br />
staging areas also would be used for a temporary office trailer, equipment parts and supplies<br />
storage, equipment and vehicle parking, equipment fueling, and an explosives magazine.<br />
Staging areas include sites adjacent to Powerhouse Road next to the dam. SA-2 is occupied<br />
by a private residence (which would have to be purchased) and SA-1 is occupied by a shed<br />
owned by PacifiCorp. Disposal areas (e.g., SA-3 and SA-5) may temporarily double as<br />
staging areas. Additional small flat areas adjacent to access roads would also be used as<br />
staging areas (for example, SA-4 adjacent to the flowline to be removed). At the primary<br />
sites, preparation would include removal of existing buildings, some grading, and laying an<br />
all-weather surface with gravel. Smaller sites would require clearing of vegetation, grading,<br />
and gravelling.<br />
The concrete to be removed from the dam and surge tank would either be recycled or buried<br />
and covered on SA-3, the 8-acre site a few thousand feet upstream of the dam and owned by<br />
PacifiCorp. About 7 acres of SA-3 would be available for use, as the site is subject to City of<br />
White Salmon well-setback limitations for the water supply well located at the eastern end of<br />
the parcel. The 2 to 3 acres nearest to the lake are proposed for temporary storage or<br />
permanent disposal. This section would need to be cleared of forest vegetation. Topsoil<br />
would be removed and stockpiled, probably between the disposal location and an adjacent<br />
residence. Some additional redistribution of earth would likely be necessary to facilitate<br />
disposal and covering of the concrete. When work on this parcel is complete, the area would<br />
be graded to naturally drain to the west (as before) and the entire site would be revegetated.<br />
Concrete recycling, the preferred disposal method, would occur at a site not yet identified<br />
that is assumed to have the following characteristics. The recycling site would be<br />
independent of the <strong>Condit</strong> project and would have or would acquire its own permits. For<br />
analysis purposes, the site is assumed to be within 30 miles of <strong>Condit</strong> <strong>Dam</strong> and would require<br />
hauling the concrete on SR 14 and SR 141. Any concrete crushing would occur at the<br />
recycling site.<br />
A temporary disposal/storage area for the wood from the wood-stave flowline and penstock<br />
would be established on property owned by the Becker family located a few hundred feet<br />
east of the flowline (SA-5). The site is a grass field that may be used as is or graded to<br />
accommodate stacking the treated lumber staves and loading them onto trucks to go to the<br />
recycling site. The driveway (AR-13) would require upgrading to accommodate truck traffic.<br />
The wood may go to a facility to be remilled for use in other wood-stave pipelines or<br />
remilled as lumber. The steel from the flowline hoops and other facility components may be<br />
temporarily stored at the Becker site or staging locations before it is hauled away for<br />
recycling.<br />
At the conclusion of the proposed action, all temporarily disturbed areas, including the<br />
staging areas, would be regraded and revegetated consistent with the proponent’s<br />
revegetation plan.<br />
3.1.2 <strong>Access</strong> Roads<br />
<strong>Access</strong> roads throughout the project area are necessary to perform the removal operations<br />
defined by the Settlement Agreement and the associated reclamation and monitoring<br />
3-15