<strong>Condit</strong> <strong>Dam</strong> Hydroelectric Project<br />

Final Supplemental EIS<br />

Table 3-2 (Continued)<br />

Proposed Project Schedule<br />

Time Period<br />

September – October 2008<br />

October 2008<br />

October 2008 – April 2009<br />

November 2008<br />

November 2008 – July 2009<br />

February – April 2009<br />

March – May 2009<br />

March 2009 – March 2010<br />

August 2009<br />

Source: PacifiCorp 2004<br />

Action<br />

Remove Obermeyer gates, Tainter gate and radial gates<br />

Install temporary water line<br />

Northwestern Lake Bridge modification<br />

Remove debris from drain tunnel location<br />

Remove debris from drain tunnel location<br />

Blast tunnel plug and drain reservoir<br />

Cofferdam removal<br />

Demolish headworks<br />

Demolish dam<br />

Fill in tail race<br />

Remove flowline, penstocks, and surge tank<br />

Remove transmission line and substation<br />

Demobilization for dam removal activities<br />

3-24