<strong>Condit</strong> <strong>Dam</strong> Hydroelectric Project<br />

Final Supplemental EIS<br />

Table 1-1 (Continued)<br />

Summary of Impacts and Mitigation Measures<br />

Impacts<br />

Mitigation<br />

Public Services<br />

• Public services will be temporarily disrupted by dam removal activities. • Coordinate with local police, fire and emergency service personnel on<br />

potentially hazardous areas, the schedule for blasting and dam breaching,<br />

and public notification. Continue this coordination for post-removal<br />

management activities.<br />

• Coordinate with the <strong>Washington</strong> State Patrol during dam removal and<br />

post-removal management activities relative to traffic impacts on state<br />

highways.<br />

• Implement a traffic control plan during dam removal and post-removal<br />

management activities that provides for police, fire and emergency service<br />

access to minimize impacts to response times.<br />

• In coordination with the City of White Salmon, install a temporary water<br />

supply (probably 14-inch HDPE pipe) across the lake with a cable support<br />

system before the dam is breached. Install a permanent line after the dam<br />

is breached, low enough to be protected from river scour.<br />