44 New Conception and <strong>Decision</strong> <strong>Support</strong> <strong>Model</strong> for <strong>IUWS</strong><br />
Table 17: Matrix for calculating cost and energy consumption of UD<br />
calculation of:<br />
1. costs<br />
2. energy<br />
no. system option<br />
1 Sys. Base<br />
1.1 external source (CA)<br />
1.2 + local source (UD)<br />
2 Sys. +Rainwater<br />
2.1 + roof-water (WUU)<br />
[1] 2.2 + local source (UD)<br />
+ surface runoff (UD)<br />
2.3 + local source (UD)<br />
+ surface runoff (UD)<br />
+ roof-water (WUU)<br />
3 Sys. +Reuse<br />
3.1 + indirect potable (UD)<br />
3.2 + direct non-potable (UD)<br />
3.3 + direct non-potable<br />
(WUU)<br />
[2] 4 Sys. +Both<br />
4.1<br />
(2.3+<br />
3.1)<br />
4.2<br />
(2.3+<br />
3.2)<br />
4.3<br />
(2.3+<br />
3.3)<br />
+ local source (UD)<br />
+ surface runoff (UD)<br />
+ roof-water (WUU)<br />
+ indirect potable (UD)<br />
+ local source (UD)<br />
+ surface runoff (UD)<br />
+ roof-water (WUU)<br />
+ direct non-potable (UD)<br />
+ local source (UD)<br />
+ surface runoff (UD)<br />
+ roof-water (WUU)<br />
+ direct non-potable<br />
(WUU)<br />
system size<br />
[m 3 /d]<br />
abstraction &<br />
transmission<br />
raw water<br />
treatment<br />
distribution<br />
(networks)<br />
collection<br />
(sewer + drain)<br />
used water<br />
treatment<br />
rainwater<br />
(surface runoff)<br />
- i. ii. iii. iv. v. vi. -<br />
[1]<br />
when surface runoff is considered as local water sources, the other types of local sources are<br />
automatically taken into account.<br />
[2]<br />
there are more possibilities of combination. However, if such complicated options are considered, it<br />
means that the water is very scarce, whereby only these three extreme options are involved.<br />
Explanation: as the exemplar, the table is blank. During the calculation, two tables are generated for<br />
system cost and energy consumption each.<br />
summation