54 New Conception and <strong>Decision</strong> <strong>Support</strong> <strong>Model</strong> for <strong>IUWS</strong><br />
If WUU is designed as the single project, then it can exactly follow the procedure in<br />
Figure 25. If WUU is designed within UD, after managing its water usage, it needs to go to<br />
superior level for requesting the necessary information firstly (as shown in Figure 22).<br />
Thereby, the procedure is further developed.<br />
3.2.3 Planning of water entity of ZONE type<br />
In the hierarchy, the planning procedure for water entities of ZONE type is the combination<br />
of the two procedures in Figure 22 and in Figure 25. The entire planning procedure of<br />
CA is shown in Figure 26. As the inferior water entities of CA, the planning procedure of UD<br />
is already embedded in. If the procedure is used only for UD, the steps of a.i, a.ii and a.iii in<br />
Figure 26 are skipped. As there are interactions between water entities in different levels, the<br />
iteration is needed in order to achieve the appropriate and optimised solutions.<br />
Planning procedure for water entities of type CA and UD<br />
Step main work and aims<br />
a b c d<br />
in CA<br />
in UD<br />
in WUU<br />
in WUC<br />
d.i Stage One: water usage management<br />
d.ii ۞ if there are more WUC, repeat step d.i<br />
c.i Stage One: water usage management<br />
c.ii ۞ if there are more WUU, repeat step c.i<br />
b.i Stage One: water usage management<br />
b.ii ۞ if there are more UD, repeat step b.i<br />
a.i Stage One: water usage management<br />
a.ii Stage Two: design of WIS for CA<br />
b.iii Stage Two: design of WIS for UD<br />
c.3 Stage Two: design of WIS for WUU<br />
b.iv adaptability inspection of UD for its WUU<br />
۞ if not proper or can be optimised, go to step b.iii<br />
a.iii adaptability inspection of CA for its UD<br />
۞ if not proper or can be optimised, go to step a.ii<br />
output of the optimised <strong>IUWS</strong><br />
Figure 26: Planning procedure for water entities of type CA and UD