10.07.2015 Views

General Plan Policy Document (Adopted 7-11 ... - City of Wheatland

General Plan Policy Document (Adopted 7-11 ... - City of Wheatland

General Plan Policy Document (Adopted 7-11 ... - City of Wheatland

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TRANSPORTATION AND CIRCULATION, Chapter 22.2. The <strong>City</strong> shall prepare a Major Projects Financing <strong>Plan</strong>.Responsibility:<strong>City</strong> Manager<strong>City</strong> EngineerTime Frame: FY 2006-2007REGIONALCOORDINATIONThe reduction <strong>of</strong> regional traffic congestion in Downtown<strong>Wheatland</strong> is important to the quality <strong>of</strong> life and small-towncharacter <strong>of</strong> <strong>Wheatland</strong>. At the same time, SR 65 provides neededregional connections which facilitate economic development. The<strong>General</strong> <strong>Plan</strong> calls for improvements to the regional transportationsystem, most notably an eastern bypass to SR 65. The <strong>General</strong> <strong>Plan</strong>also calls for exploration <strong>of</strong> the potential for relocation <strong>of</strong> the UnionPacific railroad tracks parallel to the SR 65 bypass to further reducetraffic congestion and reduce impediments to orderly development<strong>of</strong> <strong>Wheatland</strong>.GOAL 2.BTo coordinate <strong>City</strong>–planned transportation and circulationimprovements with county, State, and Federal transportationsystems, and to promote the financing and construction <strong>of</strong> a bypassto SR 65.POLICIES2.B.1. The <strong>City</strong> shall complete a study <strong>of</strong> the eastern SR 65 bypassalignment to reduce the use <strong>of</strong> <strong>Wheatland</strong> streets by regionalthrough traffic, and shall provide corridor protection for theselected route.2.B.2. The <strong>City</strong> shall proactively pursue the relocation <strong>of</strong> the UnionPacific railroad tracks to parallel the relocated SR 65 easternbypass.2.B.3The <strong>City</strong> shall continue its cooperative participation in theactivities and plans <strong>of</strong> the Sacramento Area Council <strong>of</strong>Governments (SACOG) and Yuba-Sutter Transit.2.B.4. The <strong>City</strong> shall cooperate with Yuba and Placer Counties, aswell as Caltrans, in the development <strong>of</strong> bypass location andfunding options for SR 65.2.B.5. The <strong>City</strong> shall ensure that <strong>Plan</strong> Lines for future roadways onthe fringe <strong>of</strong> the city are prepared in coordination with theCounty and/or Caltrans, as appropriate.<strong>Wheatland</strong> <strong>General</strong> <strong>Plan</strong> <strong>Policy</strong> <strong>Document</strong>, Part II 2-7July <strong>11</strong>, 2006

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!