11.07.2015 Views

BaseStation 3200 User Manual - Baseline Systems

BaseStation 3200 User Manual - Baseline Systems

BaseStation 3200 User Manual - Baseline Systems

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

C h a p t e r 3 – A d v a n c e d P r o g r a m m i n gis used as efficiently as possible. Setting this value to zero will disable its use to control zoneconcurrency.High Flow LimitThis represents a critical limit for the system. When this value is greater than zero, the limit willbe compared against the measured reading from the flow device very minute. If the flow ratereading exceeds the limit for three or four minutes in a row, an alert will be generated. If theshut down box is set to Y (yes), then programs using this POC will be stopped and correspondingMVs will be shut off. If the flow device is a Flow+NOMV type, the flow limit is programmed intothe flow device. Then the high flow limit will be monitored and the NOMV shut off when theflow limit is exceeded – this can still happen with the controller off or powered down as long asthis flow device is powered up (external power required).Unscheduled Flow LimitWhen this limit is set to greater than zero, the flow is monitored 24x7 for any flow that does notcorrespond to running programs. This is often used with a NOMV to allow some flow that is offschedule, allowing for some manual taps or hose bibs. If the flow exceeds the limit for severalminutes then an alert is generated. If the shut down box is Y, then the associated MVs will turnoff.Monthly BudgetWhen this value is greater than zero it performs a policing function for the total water used in asingle month. If the monthly water used exceeds this number then an alert is generated. If theShut Down box is set to Y, then the associated MVs and shut off and water is stopped until thefirst of the next monthMainline LimitsThe next set of limits is set in the Mainline Setupmenu. This screen is reached by turning the dialto the Flow Menu position, highlighting theMainline Setup menu item and pressing ENTR. Ifyou are already in a flow sub-menu, press CLR toreturn to the top level, select the new menuitem and press ENTR.Most sites are served with a single mainline,meaning that all water is distributed through asingle pipe, even though there may be multiplePOCs that supply water to that pipe or mainline.Most programming, therefore, deals withmainline 1, which is the default for all flow devices, master valves, and programs. The settingsfor this screen will be explained:Valid Flow DelayThis time represents the time that it takes to achieve a steady flow rate after a valve change.This needs to take into consideration the valve open and close times (some zones turning on andothers turning off) and possible pipe fill times. The default value is 2 minutes, but may bechanged from 1 to 30 minutes. Zone changes are made at the top of the minute – after changes,Page 45<strong>Baseline</strong> <strong>3200</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!