11.07.2015 Views

wind energy resource evaluation in a site of central italy ... - WindSim

wind energy resource evaluation in a site of central italy ... - WindSim

wind energy resource evaluation in a site of central italy ... - WindSim

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

6.7.2 Speed-upIn the figures 6.9 and 6.10 the results <strong>of</strong> the cross-check<strong>in</strong>g by speed-up arereported; the label “transf clima” refers to the simulation with the sector<strong>in</strong>terpolation option enabled, while the label “wecs” refers to the case with thisoption switched <strong>of</strong>f. The green triangular marker is related to the experimentalspeed-up, calculated as the ratio between the two specified measurement stations.For <strong>in</strong>stance <strong>in</strong> figure 6.9a, for each direction sector, the velocity on mast 5424 at 15meters <strong>in</strong> is forecasted by data on mast 5428 at 30 meters. The CFD calculationswith sector <strong>in</strong>terpolation and without this options are compared with theexperimental speed-up.The RMS errors are calculated only for sectors where thermal effects are reduced,marked with the red circles.Period April-May 2007Figure 6.9 a/bFigure 6.9 c/d113

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!