12.07.2015 Views

Technical details System pro M compact®

Technical details System pro M compact®

Technical details System pro M compact®

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>System</strong><strong>pro</strong> M compact ®<strong>Technical</strong> <strong>details</strong>OVR Surge Protective DevicesSPDsCabling and installation of Surge Protective Devices in an electrical panel50 cm ruleRemember that a 10 kA lightning current passing through a 1 m length of cable generates1000 Volts. Equipment <strong>pro</strong>tected by a surge arrester is subjected to a voltageequal to the sum of the U pvoltage of the surge arrester, U dof its disconnector andthe sum of the inductive voltages of connecting cables (U1+U2+U3).It is therefore essential that the total length (L = L1+L2+L3) of the connecting cablesis as short as possible (0.50 m).If this length (L = L1 + L2+L3) exceeds 0.50m, it is necessary to carry out one of thefollowing:• Reduce this length by moving the connection terminals.• Choose a surge arrester with a lower U pvalue.• Install a second, coordinated surge arrester near the device to be <strong>pro</strong>tected so asto adapt the combined U pvalue to the impulse withstand of the equipment to be<strong>pro</strong>tected.Wiring ring surfacesThe wires must be arranged in such a way that they are as close to each other as possible(see adjacent diagram) to avoid overvoltages induced by a ring surface between phases,the neutral and the PE conductor.Routing of clean cables and polluted cablesDuring installation, lay clean cables (<strong>pro</strong>tected) and polluted cables as shown in theadjacent diagrams.To avoid magnetic coupling between the different cable types (clean and polluted), it isstrongly advised that they are kept apart (> 30 cm) and if a crossing cannot be avoided,it should be at right angles (90°).U1U DU2U PU3➤➤ ➤➤➤➤L1L2L3➤➤LPolluted cables D > 30 cm ➤ Clean cables➤CleancableMaincircuitbreakerRingsurfaceSurgearrestercircuitbreakerTerminal / MCBCleancable➤D > 30 cm➤Feeder 1➤D < 30 cm➤11MCB / SPDSPD / Earth terminalEquipotential grounding:It is critical to check the earth equipotentiality of the various items of equipment.Feeder 2NoteThe cross-section of theconnecting cables is calculatedaccording to the local shortcircuitcurrent level (where thesurge arrester is installed). Itmust be equal to the crosssectionof the installation’supstream cables.The minimum cross-section forthe earth conductor is 4 mm 2 ifthere is not a lightning conductorand 10 mm 2 if there is a lightningconductor.11/86 ABB

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!