12.07.2015 Views

Technical details System pro M compact®

Technical details System pro M compact®

Technical details System pro M compact®

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NPL1<strong>System</strong><strong>pro</strong> M compact ®<strong>Technical</strong> <strong>details</strong>LSS1/2 load shedding switchesLoadmanagementdevicesLSS1/2 LOAD SHEDDING SWITCHESThe LSS1/2 switch intervenes when the total power consumption exceeds the threshold set throughthe switch placed on the front of the device. After a preset time the switch verifi es the possibility to resetdisabled not primary loads; the attempt is repeated until a standard situation is established again.Particularly suitable in applications where load total power is higher than the one indicated in thecontract and the average power consumption in a long time interval (dozen minutes) is lower, theLSS1/2 switch can be used in public and industrial single-phase networks and for three-phasenetworks if they are symmetrical and balanced.Single-phase electricdiagramN230V~LPossibleforced NPL 1and NPL 2switch-offPossibleremotesignalling1 3 5 7 9 11 13 15The device must beinserted into the networkdownstream of maincircuit-breaker. The E notprimary load OFF contactmust be without voltage.2 4 6 8 10 12 14 16PL=Primary LoadNPL=Not Primary LoadLOADPLNPL2OEPM0150Three-phase electric diagramL1L2L3TA/5A380 V11220 VE Le1 Le21 3 5 7 9 11 13 15PLNPL1NPL22 4 6 8 10 12 14 16OEPM015111/96 ABB

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!