12.07.2015 Views

Shell Exploration & Production Contractor HSE Management - PDO

Shell Exploration & Production Contractor HSE Management - PDO

Shell Exploration & Production Contractor HSE Management - PDO

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EP2005 Volume 1<strong>HSE</strong> Procedure<strong>Contractor</strong> <strong>HSE</strong> <strong>Management</strong>(including Stoplight)RestrictedEP2005-0110-PR-10Mode 3 contract:<strong>Contractor</strong> operates within its own <strong>HSE</strong> MS that has no interfaceswith the EP Company <strong>HSE</strong> MS and is not required to report <strong>HSE</strong>performance data including incidents to EP. However, this does notexclude the possibility that the EP Company may wish to guide andinfluence <strong>HSE</strong> performance under the contract.The <strong>HSE</strong> contract mode is assigned as follows:• Determine whether each activity within the contract scope is aWork Related Activity as defined by the Group (YG) ‘IncidentClassification, Investigation and Reporting’ [24, § 2.1];• For those Work Related Activities select the accountability for<strong>HSE</strong> management by assigning them as either Mode 1 or Mode;• Assign those activities, which are not Work Related as Mode 3;• Assign a contract mode based on the aggregated modesassigned to the activities in the contract scope taking intoaccount the numbers and significance of those activities andtheir <strong>HSE</strong> risks;• In mixed mode contracts identify and document those elementswith a mode different from the overall contract mode.Subcontracts shall also be assigned a mode, in which case thecontractor who subcontracts one or more of the scope elements isresponsible for assigning the mode to each subcontract according tothis Task.Task 3: Verify Contract Holder’s competenceFor Mode 1 or Mode 2 Medium <strong>HSE</strong> Risk or High <strong>HSE</strong> Riskcontracts verify the Contract Holder’s (CH) competence according toEP Specification ‘Contract Holder and CSR HSSE Competences’ [2]and their ability to execute their assigned tasks in this Procedure.Task 4: Select contract <strong>HSE</strong> clausesSelect <strong>HSE</strong> contract clauses based on:• Output from Task 1 (<strong>HSE</strong> risks of work activities); and• Output from Task 2 (mode of contract).Refer to SCM/C&P staff and consult with the relevant <strong>HSE</strong> Adviser(EP/Dir/Reg/OpCo) for guidance on the formulation of activityspecific clauses and technical requirements.Task 5: Identify eligible contractorsPrepare a list of eligible contractors:• List eligible contractors on the basis of historical experience orexpert judgment or as directed by JV agreements or localregulation;• Mode 1 or Mode 2 Medium <strong>HSE</strong> Risk or High <strong>HSE</strong> Riskcontracts - Eligible contractors who have not had their <strong>HSE</strong>capability assessed within the last three years and who wish tobe considered shall complete and submit the questionnaire inEP Tool ‘<strong>Contractor</strong> <strong>HSE</strong> Capability Questionnaire’ [4];• Mode 1 or Mode 2 Low <strong>HSE</strong> Risk contracts - Eligible contractors’ability to manage the <strong>HSE</strong> risks associated with the contractwork scope and their historical <strong>HSE</strong> performance shall beevaluated and deemed acceptable. However they are exemptfrom the <strong>HSE</strong> capability assessment (see Tasks 6 - 9); the nextrelevant task for them is Task 10. This exemption may also beapplied at the discretion of the Contract Owner (CO) to MediumDoc. No:EP200406372810Version:2Date:30 August 2006Org. Doc. No: EP2005-0110-PR-10Custodian:EPS-<strong>HSE</strong>ECCN: Not subject to EAR Page:No US content5 of 13Printed copies are uncontrolled.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!