12.07.2015 Views

St Edmundsbury Core Strategy (December 2010)

St Edmundsbury Core Strategy (December 2010)

St Edmundsbury Core Strategy (December 2010)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Adequatecoverage is notmaintaineddue toincreases inpopulationInfrastructure‟TransportRoadNetwork/PublicTransportThe town hasa slightlycongestedroad networkandsufferssignificantlyfrom the strainof outcommutingSignificant measures arerequired to enhance busservice and usage in/tothe town and toCambridge along theA1307Both of the above areclassified as „FundamentalInfrastructure‟Necessary roadinfrastructureimprovementsby lead agenciesDevelopercontributionssought onapplication basisRisks:Adequatecoverage is notmaintaineddue toincreases inpopulation andhigh levels ofdaily vehiclemovementsWaste andUtilitiesWaste andRecycling/Potable WaterSupply/FoulSewerage andTreatment/EnergyCurrent andfuture capacityfor potablewater supply.The SFRA andWater Cycle<strong>St</strong>udy indicatephasing issueswith the foulwater andsewerage withcapacity to2021Energycapacity issuesidentified inHaverhill witha requirementto phasedevelopmentto ensuresubstation isnotoverloaded.1,604+ new homes fromHaverhill WwTW triggersrequirement for upgrade500+ new homes triggersrequired substationupgradeBoth of the above areclassified as „FundamentalInfrastructure‟Necessaryinfrastructureimprovementsprovided by leadagenciesExpansion/upgrading ofexisting facilitiesand/or provisionof new facilitiesDevelopercontributionssought onapplication basisRisks:Adequate121

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!