12.07.2015 Views

St Edmundsbury Core Strategy (December 2010)

St Edmundsbury Core Strategy (December 2010)

St Edmundsbury Core Strategy (December 2010)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

IxworthONS Population Estimate 2007: 2,270Position in <strong>Core</strong> <strong>St</strong>rategy Settlement Hierarchy: Key Service CentreIxworth has a very good network of existing infrastructure for a Key ServiceCentre of its size. Particularly it is well served currently by its local services,number of sports pitches and community facilities. There is also a good provisionof GPs in Ixworth. Whilst there is a significant level of capacity within middleschools, currently the primary school is nearing capacity, although the SuffolkSchools Reorganisation may alter capacity if both of these schools become lowertier in a two tier system. New provision and improvement of existing provision ofdesirable infrastructure such as non-pitch sports facilities, amenity open space andplaygrounds will all need to be considered. The key infrastructure constraints forIxworth are the provision of dentist which is nearing a tipping point and theconsideration of transport issues if high levels of growth are to be accommodated.IxworthThemeCapacityIssues/RisksFundamental/Essential/RequiredInfrastructureHow provisionwill be metGreenInfrastructureNatureReserves/SportsPitches/NonSports Pitches/Amenity OpenSpace/Allotments/PlaygroundsLimitedcapacity.Provision ofnaturereserves, nonpitch sports,amenity openspace andplaygroundsrequired tomeet furthergrowth.Some capacityfor sportspitches andallotments toaccommodatefuturedevelopment0+ new homes triggersrequirement for naturereserves, amenity openspace, playgrounds andnon pitch sports557+ new homes triggersrequirement for sportspitches95+ new homes triggersrequirement for allotmentsAll of the above areclassified as „RequiredInfrastructure‟Expansion/Upgrading ofexisting facilitiesand provision ofnew facilitiesDevelopercontributionssought onapplicationbasisRisks: Currentprovision willnot be capableof providing forthe increasedpopulationHealthGPs/DentistsCurrent goodGP capacity toaccommodatelevels of2,577+ new homestriggers required GPs0+ new homes triggersExpansion/Upgrading ofexisting facilitiesand provision of134

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!