12.07.2015 Views

FLH PDDM Chapter 9 - Eastern Federal Lands Highway Division

FLH PDDM Chapter 9 - Eastern Federal Lands Highway Division

FLH PDDM Chapter 9 - Eastern Federal Lands Highway Division

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EXHIBIT 9.38APPROVED STANDARD DRAWINGSDRW’G DATENO. APPR - REV DRAWING DESCRIPTION/TITLERevised December 4, 1998M157-1 03/96 - 06/97 Silt FenceM157-2 03/96 Temporary Inlet ProtectionM157-3 03/96 Straw BalesM157-5 03/96 - 12/98 Temporary Diversion ChannelsM157-6 03/96 Check DamM157-7 03/96 Temporary Erosion Control Berms, Slope Drains and Lined WaterwaysM204-1 03/96 - 08/97 Earth Berm For Roadside Barrier Terminal SectionsM204-2 03/96 Earth Berm For Median Barrier Terminal SectionsM501-1 03/96 - 05/97 Portland Cement Concrete PavementM501-2 03/96 - 06/97 Portland Cement Concrete Pavement JointsM501-3 03/96 - 05/97 Concrete Paving PatchingM501-4 03/96 Concrete Pavement Removal MethodsM601-1 03/96 - 05/97 Concrete HeadwallsM601-2 03/96 - 08/97 Slope Paving for Concrete HeadwallsM601-3 03/96 - 08/97 Wingwalls for Concrete HeadwallsM601-4 03/96 - 08/97 Concrete Headwall for 450 to 900 mm Pipe CulvertM601-5 03/96 - 05/97 Concrete Headwalls for 1050 to 2100 mm Pipe CulvertM601-6 03/96 - 05/97 Concrete Wingwalls for Single Skew 1050 to 2100 mm CulvertsM601-7 03/96 - 05/97 Concrete Wingwalls for Multiple Normal 1050 to 2100 mm CulvertsM601-8 03/96 - 05/97 Concrete Wingwalls for Multiple Skew 1050 to 2100 mm CulvertsM602-1 03/96 - 10/97 Metal Pipe CulvertM602-2 03/96 - 08/97 Metal Pipe Culvert Coupling BandM602-3 03/96 - 12/98 Metal and Plastic Pipe Culvert BeddingTransmittal No. 11 - December 4, 1998 Sheet 1 of 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!