12.07.2015 Views

FLH PDDM Chapter 9 - Eastern Federal Lands Highway Division

FLH PDDM Chapter 9 - Eastern Federal Lands Highway Division

FLH PDDM Chapter 9 - Eastern Federal Lands Highway Division

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FigureLIST OF FIGURESPage9-1 Superelevation Transition on Short TangentsBetween Broken-Back Curves ................................................. 9-199-2 Superelevation Transitions for Broken-Back Curves ................................ 9-209-3 Determining Flat Sections Between ReversingCurves with Short Tangents ................................................... 9-219-4 Reserved9-5 Lateral Clearance for Stopping Sight Distance ..................................... 9-319-6A Desirable Horizontal Stopping Sight Distance ..................................... 9-329-6B Minimum Horizontal Stopping Sight Distance ..................................... 9-339-7 Determining Low Points on Vertical Curves with Unequal Grades ..................... 9-349-8 Eliminating Broken-Back Vertical Curves ........................................ 9-369-9 Typical Road Cross Section Elements ........................................... 9-399-10 Typical Cut Slope End Treatment .............................................. 9-429-11 Falling Rock Control ........................................................ 9-469-12 Rolling Rock Control ........................................................ 9-479-13 Serrated Slopes ............................................................. 9-499-14 Right Turn Deceleration Lanes for Non-controlled Access <strong>Highway</strong>s ................... 9-519-15 Right Turn Acceleration Lanes for Non-controlled Access <strong>Highway</strong>s ................... 9-529-16 Slow Moving Vehicle Turnout ................................................. 9-549-17 Left Turn Storage Guidelines for Unsignalized TwoLane <strong>Highway</strong> Intersections ................................................... 9-659-18 Left Turn Storage Lengths for Unsignalized TwoLane <strong>Highway</strong> Intersections (60 km/h) ........................................... 9-669-19 Left Turn Storage Lengths for Unsignalized TwoLane <strong>Highway</strong> Intersections (80 km/h) ........................................... 9-679-20 Left Turn Storage Lengths for Unsignalized TwoLane <strong>Highway</strong> Intersections (100 km/h) .......................................... 9-689-21 Right Turn Lane Guidelines ................................................... 9-699-22 Right Turn Pocket or Taper ................................................... 9-70v

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!