12.07.2015 Views

West Bengal Report-IPAI.pdf - Sarva Shiksha Abhiyan

West Bengal Report-IPAI.pdf - Sarva Shiksha Abhiyan

West Bengal Report-IPAI.pdf - Sarva Shiksha Abhiyan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

218Apart from the above, one voluntary Resource person continuedto draw salary from 2006-07 to Rs.2007-08 (Rs.18315) on occasionalvisit to the school asneither any attendance nor any nature of workdone could be shown to the study Team (January 2009).14.4 MISUTILISATION OF RS. 5.08 LAKHKalitala Diara Raja J.K. High School,Murshidabad Districtreceived Rs.5.10 lakh on 27 t h February 2007 (Rs.1.70 lakh) and 13 t hApril 2007 (Rs.3.40 lakh) for constructionof 3 Additional class rooms(ACRs). During visit of the school on 13.12.2008, it wasascertainedthat through the school Authority incurred expenditure of Rs.5.08 lakhduring the period from May 2007 to May 2008 for construction, therewas no trace of 3 ACRs. Only 3 alls were constructed.Teachers of the School stated that the Secretaryof the SchoolManagement committee was responsible for such misutilisation but thelatter tendered resignation. It was also noticed that the Junior Engineersupervising the work did not report the matter to the DPOMurshidabad with detailed accounts of expenditure.The matter being pointed out to the DPO, the latter intimatedthat necessary investigation would be conducted.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!