12.07.2015 Views

West Bengal Report-IPAI.pdf - Sarva Shiksha Abhiyan

West Bengal Report-IPAI.pdf - Sarva Shiksha Abhiyan

West Bengal Report-IPAI.pdf - Sarva Shiksha Abhiyan

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

225(Sadar <strong>West</strong>)4 Haridasmati KalachandPrimary (Sadar <strong>West</strong>)5 Mahalandi G.C. High(UPS) (Kandi CLRC)6 Netriabad F. Pry (CanningCLRC)7 Howramari F.P. (CanningCLRC)one of the classrooms and made ofcorrugated asbestos. As reported,during rainy season classroomswere in innundated due to leakageof Water through the asbestosroof.The school building was not ingood condition. During rains,water was soaking through thewalls dampening whole classroom. A new classroom was underconstruction. But the work ofconstruction, which wasreportedly being executed bycontractor in violation of SSAnorm, was lying incomplete andthe work remained suspended forthe last 3-4 monthsThe windows of other classroomswere uncovered (No window panswere there).5 of the 10 classrooms were indilapidated condition. The factwas reported to CLRC (asinformed to the team) without anyaction..The school building was in a badshape. The building had no RCCroof. Theroof was made ofasbestos sheet. As reported thehall in which the classes were heldwas inundated due to leakage ofwater through the porous asbestos– during rains. Windows had nocover/pans. Floor was founddamaged and the students sit onthis damaged floor (on mats.)Old building – having 3classrooms. During rains, waterleakage through the roof. Allwindows were found broken. Iclassroom was newly constructed.2 classrooms were in dilapidatedcondition requiring repair.1 class room out of 2 class roomswas found dilapidated8 Mahalandi mandalaparaPrimary (Kandi CLRC)9 Namukandi Primary(Kandi CLRC)10 Kadambari Primary The school building was partially

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!