12.07.2015 Views

West Bengal Report-IPAI.pdf - Sarva Shiksha Abhiyan

West Bengal Report-IPAI.pdf - Sarva Shiksha Abhiyan

West Bengal Report-IPAI.pdf - Sarva Shiksha Abhiyan

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

223accommodation available for the DPO was inadequate.However the office was having electric connection and toiletwith water connection.(A2) District : South 24 ParganasThe district Project Office, South 24 Parganas wasaccommodated in the premises of District Collector’s officefree of cost (rent free). The accommodation was not sufficientfor the DPO. However the office was having regular supply ofelectricity and toilet with water connection.BCircle Level Resource Centres (CLRC) Builidings-All the 3 CLRCs viz Kandi and Sadar <strong>West</strong> underMurshidabad District Project Office and Diamond HarbourSouth under South 24 Parganas District Project Office visitedby the Study Team, had their own office building and whichalso accommodated the offices of the Sub Inspector of Schools(SI/s), perfrorming <strong>Sarva</strong>shiksha duties addition to their (SI/S)normal duties as SI/S they had to perform the duties of circleProject Co-ordinator (CPC). The accommodations available forCLRC offices were, therefore, not adequate. The CLRC officeswere having electric connection and toilet with waterfacilities.15.3 School Buildings :Position of civil works of the 56 schools (includingsurprise visit to 6 schools) visited by the Study Team was asunder :

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!