TO 00-20-14 30 SEPTEMBER 2011 - Wright-Patterson Air Force Base
TO 00-20-14 30 SEPTEMBER 2011 - Wright-Patterson Air Force Base
TO 00-20-14 30 SEPTEMBER 2011 - Wright-Patterson Air Force Base
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>TO</strong> <strong>00</strong>-<strong>20</strong>-<strong>14</strong> <strong>30</strong> September <strong>20</strong>112.2.3.5 Facility funds are part of 33<strong>00</strong> (Military Construction – <strong>Air</strong> <strong>Force</strong>) appropriations. This includes major andsome minor construction projects as well as facility project planning efforts.2.2.3.6 AFMC is responsible for funding research and development projects. This includes support required for thoseprojects turned over to other operating commands.Figure 2-1. AFMETCAL Program Resources And Planning Interfaces.2-2