12.07.2015 Views

TO 00-20-14 30 SEPTEMBER 2011 - Wright-Patterson Air Force Base

TO 00-20-14 30 SEPTEMBER 2011 - Wright-Patterson Air Force Base

TO 00-20-14 30 SEPTEMBER 2011 - Wright-Patterson Air Force Base

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>30</strong> September <strong>20</strong>11 <strong>TO</strong> <strong>00</strong>-<strong>20</strong>-<strong>14</strong>8.<strong>14</strong>.4 F-16 Supporting Type II( ) PMEL Requirements.8.<strong>14</strong>.4.1 Type II( ) PMELs supporting the F-16 may require additional floor space to accommodate a 3’X6'surface plateand stand. A surface plate of this size shall require a working area approximately 15'X16' feet. Floor loading beneathsurface plate shall be capable of supporting approx. 5<strong>00</strong>0 pounds (35<strong>00</strong> pound surface plate plus ancillary blocks).8.<strong>14</strong>.4.2 Additional workspace may be required in a Type II PMEL supporting an F-16 ESS. An increase in workload ofapproximately 2<strong>00</strong> items of F-16 related support equipment can be expected in the Type II.8.15 ENVIRONMENTAL LIMITS FOR USNS OBSERVATION ISLAND AND RASCAL.8.15.1 USNS Observation Island environmental operating limits are as follows:a. Temperature = 73 ±6 °F.b. Humidity = 15% RH to 70% RH.8.15.2 RASCAL environmental operating limits are as follows:a. Temperature = 73 ±6 °F.b. Humidity = <strong>20</strong>% to 50% RH.8-9/(8-10 Blank)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!