12.07.2015 Views

April 16, 2012 - Cabarrus County

April 16, 2012 - Cabarrus County

April 16, 2012 - Cabarrus County

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SchoolHarrisburgElementaryHickory RidgeMiddle SchoolHickory RidgeHigh SchoolCurrentAvailableCapacityCurrentAvailableCapacityIncludingStudentsGeneratedby ProjectPlannedCapacity2 YrsAvailableCapacityIncludingStudentsGeneratedby ProjectPlannedCapacity5 YrsAvailableCapacityIncludingStudentsGeneratedby Project159 86 159 86 159 86-105 -137 -105 -137 -105 -1376 -23 6 -23 6 -23Adequacy DeterminationAs illustrated above, adequate school capacityat the middle and high school does not exist currentlyfor this residential subdivision project, nor does it exist at the two year and five year reviewlevels.(Note that according to Section 15-9, Number 3, of the APFO, “…future available capacitymust be“…equal to or greater than the projected enrollment that will be produced bythe proposeddevelopment for all school types,” not just one or two.)Is the project subject to Chapter 15, Adequate Public Facilities?Yes.Board of Commissioner Action Options:Option # 1Consider approval of the Reservation of Capacitywith the conditions outlined below:1. The project is subject to a phasing schedule.In calendar year <strong>2012</strong>, no more than 13 single familyresidential lots platted;In calendar year 2013, no more than 15 single familyresidential lots platted;In calendar year 2014, no more than 15 single familyresidential lots platted;In calendar year 2015, no more than 15 single familyresidential lots platted;In calendar year 20<strong>16</strong>, no more than 15 single familyresidential lots platted;In calendar year 2017, no more than 157 single familyresidential lots platted.2. Mitigation of the pro-rata share of the cost of the planned capacity, which equals $7,631.00 persingle familyresidential subdivision lot, payable prior to final platting.Option # 2Consider approval of the Reservation of Capacity with the phasing schedule proposed by theapplicant.1. Applicant proposed phasingschedule.In calendar year <strong>2012</strong>, no more than 48 single familyresidential lots platted;In calendar year 2013, no more than 77 single familyresidential lots platted;In calendar year 2014, no more than 52 single familyresidential lots platted;In calendar year 2015, no more than 53 single familyresidential lots platted.2Attachment number 1G-2Page <strong>16</strong>4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!