12.07.2015 Views

April 16, 2012 - Cabarrus County

April 16, 2012 - Cabarrus County

April 16, 2012 - Cabarrus County

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

March 19, <strong>2012</strong> (Regular Meeting)PageExhibit IIExhibit IIIExhibit IVExhibit VAssumptions and Clarifications (Exhibit F of the Turner 6 th & 7 thFl. Alteration Amendment 5 Book dated March 5 th , <strong>2012</strong>)Matrix for The General conditions and ConstructionManagement Fee (Exhibit 1 of the Turner CM at Risk Contract)Contract document list (Exhibit H of the Turner 6 th & 7 th Fl.Alteration Amendment 5 Book dated March 5 th , <strong>2012</strong>)Basis of the Estimate (Exhibit D of the Turner 6 th & 7 th Fl.Alteration Amendment 5 Book dated March 5 th , <strong>2012</strong>)ARTICLE 2- CONTRACT TIMEThe Date of Substantial completion established by this amendment isJuly 17, <strong>2012</strong>.Owner: <strong>Cabarrus</strong> <strong>County</strong>, North Carolina/s/ Michael K. Downs<strong>County</strong> ManagerCM at Risk: Turner Construction Company/s/ Gary StradowskiVice President and General ManagerTurner Exhibit CCABARRUS COUNTY SHERIFF’S DEPARTMENTAMENDMENT # 5 TO THE GMP – 6 TH and 7 TH FLOOR ALTERATIONSEXECUTIVE SUMMARYThe cost for Amendment #5 to the GMP – Sheriff’s Department 6 th and 7 th FloorAlterations at the <strong>Cabarrus</strong> Detention Center and Sheriff’s Department projectin Concord, NC, is $1,484,360.001) Griffin Architecture, P.A. construction drawings for the <strong>Cabarrus</strong><strong>County</strong> Sheriff’s Department – 6 th and 7 th Floor Alterations dated January17, <strong>2012</strong>. (See Documents List Log in Exhibit H, attached)2) Griffin Architecture, P.A. project manual for the <strong>Cabarrus</strong> <strong>County</strong>Sheriff’s Department – 6 th and 7 th Floor Alterations dated January 17,<strong>2012</strong>. (See Documents List Log in Exhibit H, attached)3) Griffin Architecture, P.A. Addenda numbers 1 and 2 (dated January 31,<strong>2012</strong> and February 20, <strong>2012</strong>).4) Turner Construction’s Clarifications and Assumptions attached withinthis Amendment.The summary below details the cost of Amendment # 5:Trade Package Cost $1,159,815Subguard Program $7,846Turner/Liability Insurance $14,487Direct Work Sub-Total $1,182,148Payment and Performance Bond $11,145Builder’s Risk Insurance $1,076Cost of the Work Total $1,194,369Turner General Conditions $135,336Turner CM Fee $57,369Total $1,387,074Contractor’s Contingency of 4%On the Cost of the Direct Work $47,286Project Total $1,434,360Allowance – Owner’s Contingency $50,000Amendment # 5 to the GMP $1,484,360This Amendment # 5 to the GMP is based on Owner acceptance on March19 th , <strong>2012</strong>.Attachment number 2A-1Page 18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!