13.07.2015 Views

view / download the documents. - til india

view / download the documents. - til india

view / download the documents. - til india

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

026027Estimates for Construction Equipment Requirements for <strong>the</strong> Eleventh PlanSectorEquipment cost as a % of totalinvestmentTotal Investment envisaged in<strong>the</strong> Eleventh PlanConstruction EquipmentRequirement during <strong>the</strong>Eleventh Plan (Rs. Billion)Residential Construction 4.5 3,613.18 162.59Airport 20 450 90.00Oil and Gas 5 to 7 2,690 134.50-188.30Ports 30 to 35 1,050 315.00-367.50Power Generation 21 to 24 6,000 1,260.00-1,440.00Power (T&D) 5 4,500 225.00Roads 21 to 23 4,014.88 843.13-923.42Railways 6 to 8 2,510 150.60-200.80Source: India Infrastructure ResearchIndia: Infrastructure OpportunityTIL in its endeavour to gear up for <strong>the</strong> next level of opportunity optimisation, has initiated all necessary steps to take full advantage of <strong>the</strong>seemerging opportunities in <strong>the</strong> infrastructural space of <strong>the</strong> country, with its current as well as proposed product range to be introduced in <strong>the</strong>near future.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!