13.07.2015 Views

Warrawee Substation - Review of Environmental Factors

Warrawee Substation - Review of Environmental Factors

Warrawee Substation - Review of Environmental Factors

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Warrawee</strong> <strong>Substation</strong> Page 4Operational Noise & Construction Noise & Vibration AssessmentReport No. 11332 Version Bground services, pit and slab construction, construction <strong>of</strong> external pits including installation<strong>of</strong> ‘Humeceptor’ and construction <strong>of</strong> Bund Yard 1, 2 and 3. Bulk Earthworks & Excavation – Site clearing and demolition, bulk excavation and detailedexcavation, movement <strong>of</strong> excavated material to stockpile Superstructure Construction – Construction <strong>of</strong> <strong>Substation</strong> structure, installation <strong>of</strong> rough ins,fit outs and finishes Road Pavement – Repaving <strong>of</strong> Brentwood Ave and Hastings Road in the sections closest tothe site Fitout & Commissioning – Installation <strong>of</strong> rectifiers, transformers, cabling within site andcloser to the rail line. Site Demobilisation – Removal <strong>of</strong> all construction equipment and plant, materials and site<strong>of</strong>fices.Figure 2-3 provides and illustration <strong>of</strong> the site layout along with the access points to the site.Figure 2-3Site Layout for the Construction Stage

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!