13.07.2015 Views

Warrawee Substation - Review of Environmental Factors

Warrawee Substation - Review of Environmental Factors

Warrawee Substation - Review of Environmental Factors

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Assessment <strong>of</strong> the environmental impacts and risks3.18 <strong>Environmental</strong> checklists3.18.1 Clause 228 <strong>of</strong> the EP&A RegulationClause 228 <strong>of</strong> the EP&A Regulation provides a list <strong>of</strong> factors that should beconsidered in determining the likely impacts <strong>of</strong> an activity on the natural and builtenvironment. These factors are considered in Table 3.12 with reference to theproposal.Table 3.12Clause 228 matters for considerationClause 228 Factor(a) any environmental impact on a community,The proposal would have a minor adverse impact on thecommunity in the immediate vicinity <strong>of</strong> the site during construction.This would be associated with noise and air emissions, and trafficmovements associated with the construction activities. Given thatthe site is within the railway corridor, and the impacts would belimited to the construction phase, the impacts are considered to be<strong>of</strong> minor significance.As part <strong>of</strong> a broader project to improve the electricity supply to therailway network, the proposal would have an overall positive overallimpact by increasing the operational capacity. This would benefitthe wider community that utilises the railway network.(b) any transformation <strong>of</strong> a locality,The proposal would involve construction <strong>of</strong> a new building. Theproposal would also require the removal <strong>of</strong> some vegetation.Overall the proposal is considered not to transform the localitysignificantly.(c) any environmental impact on the ecosystems <strong>of</strong> thelocality,The ecosystems <strong>of</strong> the locality have been substantially modified byconstruction <strong>of</strong> the railway network and urbanisation and this hasresulted in all items <strong>of</strong> ecological significance being removed. Theproposal would result in the removal <strong>of</strong> primarily weed species.Construction and operational impacts would be limited to the siteitself and would not impact on ecosystems in the wider locality.ImpactNegative(construction)Positive(operation)NegativeNil<strong>Warrawee</strong> <strong>Substation</strong> Project/<strong>Review</strong> <strong>of</strong> <strong>Environmental</strong> <strong>Factors</strong>Page 49 <strong>of</strong> 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!