13.07.2015 Views

Warrawee Substation - Review of Environmental Factors

Warrawee Substation - Review of Environmental Factors

Warrawee Substation - Review of Environmental Factors

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Warrawee</strong> <strong>Substation</strong> Page 5Operational Noise & Construction Noise & Vibration AssessmentReport No. 11332 Version B2.3 Construction HoursThe proposed construction hours for this site are restricted to day time periods during theweekdays (between 7.00am to 6.00pm) and on Saturday between 8.00am to 1.00pm. Proposedout-<strong>of</strong>-hours works are mainly during track possessions for Electrical Works closer to the railline and on the rail line. The out-<strong>of</strong>-hours works will be planned to be on specific possessionweekends and likely to occur between 7.00am and 5.30pm. This will be discussed further in theSection 5.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!