13.07.2015 Views

Warrawee Substation - Review of Environmental Factors

Warrawee Substation - Review of Environmental Factors

Warrawee Substation - Review of Environmental Factors

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The proposalConstructionequipmentRoad plantWater cartConstruction scenarioA B C D E F G H I JCrane 300 tonne crane Low loader2.1.3 TimingConstruction activities are anticipated to take approximately 33 months to complete.The main civil construction activities would be completed within 24 months and theelectrical fit out would take approximately 9 months to complete.The works would be generally undertaken within the following standard constructionhours as specified by the DECC’s Interim Construction Noise Guidelines:Monday – Friday – 7am – 6pmSaturday – 8am – 1pmSunday and Public Holidays – no work.RailCorp’s operations are subject to an <strong>Environmental</strong> Protection Licence (12208)issued under the Protection <strong>of</strong> the Environment Operations Act 1997 (POEO Act).This licence requires RailCorp to advise neighbours likely to be affected by worksoutside ‘normal business hours’.Out <strong>of</strong> hours works (including Sunday’s) would be limited to scheduled trackpossession periods. These periods are when the rail corridor is shut down to allow forworks which occur within three metres <strong>of</strong> the operational tracks. Works undertakenduring track possessions may include activities such as connection to the overheadwiring system and installation <strong>of</strong> certain electrical equipment.2.2 Alternatives2.2.1 Options consideredThe “do nothing” optionThe ‘do nothing’ involves not building a new substation in the vicinity <strong>of</strong> <strong>Warrawee</strong>Station.Brentwood Avenue, <strong>Warrawee</strong>This option involves constructing a substation within the rail corridor to the south <strong>of</strong><strong>Warrawee</strong> Station. Modelling <strong>of</strong> the electrical distribution network indicated that a<strong>Warrawee</strong> <strong>Substation</strong> Project/<strong>Review</strong> <strong>of</strong> <strong>Environmental</strong> <strong>Factors</strong>Page 16 <strong>of</strong> 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!