13.07.2015 Views

Warrawee Substation - Review of Environmental Factors

Warrawee Substation - Review of Environmental Factors

Warrawee Substation - Review of Environmental Factors

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5. Certification <strong>of</strong> the REF 616. REF determination 627. References 64Table IndexTable 1.1 Summary <strong>of</strong> issues raised in consultation 2Table 2.1 Key features <strong>of</strong> the proposal 11Table 2.2Indicative traffic movements for constructionactivities 14Table 2.3 Construction equipment 15Table 3.1 Rating background levels 28Table 3.2 Site specific construction noise management levels 28Table 3.3 Criteria for exposure to continuous vibration 29Table 3.4Table 3.5Acceptable vibration dose values for intermittentvibration 29Transient vibration guide values - minimal risk <strong>of</strong>cosmetic damage 30Table 3.6 Intrusiveness criteria 30Table 3.7 Amenity criteria 31Table 3.8 Predicted noise levels during construction 31Table 3.9 Sleep disturbance 33Table 3.10Rock breaker peak particle velocity (PPV) vibrationlevels (mm/s) versus distance 34Table 3.11 Operational noise levels 34Table 3.12 Clause 228 matters for consideration 49Table 3.13 <strong>Factors</strong> listed under the EPBC Act 52Table 3.14 Summary <strong>of</strong> control measures 54Figure IndexFigure 1.1 Site location 3AppendicesA Design plansB Flora and Fauna memorandum<strong>Warrawee</strong> <strong>Substation</strong> Project/<strong>Review</strong> <strong>of</strong> <strong>Environmental</strong> <strong>Factors</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!