13.07.2015 Views

Warrawee Substation - Review of Environmental Factors

Warrawee Substation - Review of Environmental Factors

Warrawee Substation - Review of Environmental Factors

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Warrawee</strong> <strong>Substation</strong> Page 34Operational Noise & Construction Noise & Vibration AssessmentReport No. 11332 Version B10 CONCLUSIONThe Operation Noise & Construction Noise & Vibration Assessment for <strong>Warrawee</strong> Traction<strong>Substation</strong> has been prepared to assess the potential impact <strong>of</strong> the operations <strong>of</strong> the substationand also the impact from the construction works.The Operational Assessment <strong>of</strong> the substation indicates that the operation will comply with therelevant criteria as stated in the NSW Industrial Noise Policy (INP). The assessment has beenmade based on a worst case scenario where the Transformers would be operating at maximumload.The Construction Noise & Vibration Assessment recommends mitigation and managementmeasures for noise generated by the works, reducing potential impact to the surroundingreceivers. Assessment <strong>of</strong> vibration impact levels indicate that any potential impact fromvibration is predicted to be within relevant criteria.Management and mitigation measures to reduce noise impact at receivers have been identified,and are listed in Section 8 above. With proper management and mitigation, the potential noiseand vibration impact at the receivers can be minimised.Impacts from <strong>of</strong>f-site traffic noise are predicted to be within criteria adopted from the RoadNoise Policy, which do not strictly apply but are considered the most relevant.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!