Warrawee Substation - Review of Environmental Factors

Warrawee Substation - Review of Environmental Factors

Warrawee Substation - Review of Environmental Factors

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The proposalPlant and equipmentTable 2.3 provides an indication <strong>of</strong> the construction plant and equipment that would berequired during particular construction scenarios. The construction scenarios outlinedin Table 2.3 are as follows:A – Site establishmentB – Piling worksC – Retaining wall worksD – EarthworksE – External pitsF – Pit and slab constructionG – <strong>Substation</strong> constructionH – Road pavementsI – Electrical works (fit out)J – Site clean-upTable 2.3 Construction equipmentConstructionequipmentEight Wheel CraneTruckConstruction scenarioA B C D E F G H I J Skid steer loader Site dumper 50 tonne crane Piling rigAgitators Rough terrain craneExcavator Bogie tipper Shotcrete pump Sweeper watertruck Concrete pump Roller<strong>Warrawee</strong> <strong>Substation</strong> Project/<strong>Review</strong> <strong>of</strong> <strong>Environmental</strong> <strong>Factors</strong>Page 15 <strong>of</strong> 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!