13.07.2015 Views

Warrawee Substation - Review of Environmental Factors

Warrawee Substation - Review of Environmental Factors

Warrawee Substation - Review of Environmental Factors

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Warrawee</strong> <strong>Substation</strong> Page 18Operational Noise & Construction Noise & Vibration AssessmentReport No. 11332 Version BScenarioFitout &CommissioningSiteDemobilisationDuration <strong>of</strong>Works215 Days20 DaysSound SoundPower PowerEquipmentLevel, Level,L Aeq L Amax(dBA) (dBA)15 Tonne Excavators (2) 103 110Road Paver 103 108Dump Truck 108 113Skid Steer Loader 107 111Site Dumper (2) 104 111Pr<strong>of</strong>iler 107 112Sweeper Water Truck 108 113300 Tonne Crane 106 111Support Vehicles (2) 90 95Low Loader (2) 106 111Eight Wheel Crane Truck 104 109Eight Wheel Crane Truck 104 10950 Tonne Crane 105 110Dump Truck 104 111Site Dumper 104 111Noise predictions have been made based on the possible worst-case impacts taking intoconsideration the most likely scenario for typical construction. This has been made based ondiscussions with the client on most likely construction scenarios and locations <strong>of</strong> plant. As aworst-case scenario, this assumes that most <strong>of</strong> the relevant plants would be operating duringmost <strong>of</strong> the 15-minute assessment period.The following activity L Aeq,15min noise levels have been assumed:Site EstablishmentoNoisiest activity would be from the Franna Crane and the 50 Tonne Crane movingplant into site. Other plant such as the piling rig would be established but won’t beoperational at this stage. L Aeq,15min noise levels for this would be 107dBA.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!