13.07.2015 Views

Warrawee Substation - Review of Environmental Factors

Warrawee Substation - Review of Environmental Factors

Warrawee Substation - Review of Environmental Factors

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Preliminaries<strong>Warrawee</strong> Station and the Hastings Road access gate. Vegetation located alongBrentwood Avenue includes bamboo which assists to screen views <strong>of</strong> the rail corridorfrom residences along Brentwood Avenue.No heritage items are located on the site or are considered likely to occur on site dueto the past disturbance <strong>of</strong> the site. Further details <strong>of</strong> heritage are located in Sections3.6.1 and 3.7.1.1.4 ConsultationAs indicated in Section 1.5.1, under Clause 42 <strong>of</strong> State <strong>Environmental</strong> Planning Policy(Infrastructure) 2007 (ISEPP), RailCorp is required to notify the relevant Council andoccupiers <strong>of</strong> adjoining land and consider issues raised in responses.RailCorp will be conducting a comprehensive community consultation program toensure residents and other stakeholders close to the proposed site are fully informedabout the scope <strong>of</strong> the work involved and that they have the opportunity to providetheir feedback.Activities will include meeting with Ku-ring-gai Council, letterbox drops and face-t<strong>of</strong>aceconsultation with nearby residents.This REF contains detailed information about the type <strong>of</strong> work involved, potentialenvironmental and other impacts and mitigation strategies. The community is invitedto review the REF and to provide feedback about the project before the REF isdetermined. Table 1.1 summarises the response to issues that were raised.Table 1.1 Summary <strong>of</strong> issues raised in consultationIssueRailCorp response[To be updated after community consultation]<strong>Warrawee</strong> <strong>Substation</strong> Project/<strong>Review</strong> <strong>of</strong> <strong>Environmental</strong> <strong>Factors</strong>Page 2 <strong>of</strong> 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!