13.07.2015 Views

Warrawee Substation - Review of Environmental Factors

Warrawee Substation - Review of Environmental Factors

Warrawee Substation - Review of Environmental Factors

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The proposalSite clean-up (Scenario J) – Involves the removal <strong>of</strong> all activities not requiredduring the operation <strong>of</strong> the substation. This would primarily be the removal <strong>of</strong> theconstruction compound.Plant and equipment to be used during each stage is outlined in the section below.Site compoundThe site compound is to be positioned within the rail corridor to the north <strong>of</strong> thesubstation site. The site would be along the existing access track which runs betweenBrentwood Avenue and Hastings Road. The compound would contain site <strong>of</strong>fices andstockpiling areas. Site <strong>of</strong>fices and stockpile areas would generally be positioned alongthe eastern fence line <strong>of</strong> the corridor. These areas currently contain trees, howeverscheduled RailCorp maintenance requires these trees to be removed. This treeremoval is expected to commence prior to works commencing and their removal is notpart <strong>of</strong> the proposal.Construction trafficTable 2.2 provides estimates <strong>of</strong> the number <strong>of</strong> vehicles per day which are required forparticular aspects <strong>of</strong> the proposal.Table 2.2 Indicative traffic movements for construction activitiesActivity Duration (days) Average number <strong>of</strong>vehicles per dayMaximum number<strong>of</strong> vehicles per daySite establishment 100 4 15Piling works 74 5 15Retaining works 16 7 20Earthworks 80 12 25External pits 21 4 15Pit and slabconstructionBund yardconstruction<strong>Substation</strong>construction160 4 1580 2 1055 6 20Road pavement 8 7 15Site clean-up 20 8 20Source: RailCorp, 2011<strong>Warrawee</strong> <strong>Substation</strong> Project/<strong>Review</strong> <strong>of</strong> <strong>Environmental</strong> <strong>Factors</strong>Page 14 <strong>of</strong> 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!