13.07.2015 Views

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DON-<strong>BP</strong>-001<strong>Don</strong> <strong>Field</strong> <strong>Decommissioning</strong> <strong>Programme</strong>3.6 NLGP CrossingsApproximately 2km from the <strong>Don</strong> manifold, the two 8in pipelines and the two umbilicalsemerge from their trenches to cross over the 20in Northern Leg Gas Pipeline (NLGP),which is laid on the seabed.Stabilisation of the pipelines and umbilicals is provided by a combination of GlassReinforced Plastic (GRP) protection covers (8in pipelines only), flexiweight mattresses,grout formworks, grout bags and rock dump (refer to Figures 10.11 and 10.12).Figure 10.11 Pipelines and Umbilicals Layout at NLGP CrossingsFigure 10.12 Cross-section of Pipelines/Umbilicals at NLGP CrossingsPipelines10-12 May 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!