13.07.2015 Views

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Don</strong> <strong>Field</strong> <strong>Decommissioning</strong> <strong>Programme</strong>DON-<strong>BP</strong>-001Figure 2.2 <strong>Don</strong> <strong>Field</strong> <strong>Decommissioning</strong> Indicative TimelineThe offshore work programme for decommissioning will typically have the followingmain phases: Pre-decommissioning Surveys <strong>Field</strong> Abandonment Well Abandonment9 LegacyThe owners will be responsible for monitoring material left in situ as a result of carryingout these <strong>Decommissioning</strong> <strong>Programme</strong>s and for ensuring that the site and the materialleft remain in situ as expected.A photographic survey and study of the area was undertaken in 2004 prior tocommencement of decommissioning work. A further survey will be carried out oncompletion of decommissioning work.Executive SummaryMay 2011 2-9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!