13.07.2015 Views

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DON-<strong>BP</strong>-001<strong>Don</strong> <strong>Field</strong> <strong>Decommissioning</strong> <strong>Programme</strong>Section 10Pipelines (cont'd)ParagraphPage5.6 Assessment of Options for the 8in Pipelines 10-255.7 Recommended <strong>Decommissioning</strong> Option for the 8inPipelines (PL598 and PL599) 10-296 Umbilicals <strong>Decommissioning</strong> (3in Chemical InjectionUmbilical (PL600) and 4in Control Umbilical) 10-306.1 General 10-306.2 Material Inventory 10-306.3 Burial Status 10-316.4 Present Condition 10-326.5 Description of Options for the Umbilicals 10-356.6 Assessment of Options for the Umbilicals 10-366.7 Recommended <strong>Decommissioning</strong> Option for the 4inControl Umbilical and 3in Chemical InjectionUmbilical (PL600) 10-407 Selected <strong>Decommissioning</strong> Option for Pipelines andUmbilicals 10-408 References 10-41Table10.1 List of Items to be Decommissioned 10-510.2 Inventory of Materials – 8in Pipelines 10-1910.3 Exposure History of 8in Pipelines 10-2110.4 Summary of Relative Impacts of the Alternative<strong>Decommissioning</strong> Options for the Pipelines 10-2610.5 Inventory of Materials – 4in Control and 3in Chemical InjectionUmbilicals 10-3010.6 Exposure History of the 4in Control and 3in Chemical Injection(PL600) Umbilicals 10-3210.7 Summary of Relative Impacts of the Alternative<strong>Decommissioning</strong> Options for the Umbilicals 10-37Pipelines10-ii May 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!