13.07.2015 Views

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DON-<strong>BP</strong>-001<strong>Don</strong> <strong>Field</strong> <strong>Decommissioning</strong> <strong>Programme</strong>Well No Categorisation CommentPN01 SS3 Deep-set downhole gauge cable should not form part ofthe permanent barriers as per OGUK Section 7. It isanticipated that a rig will be required to partially abandonthis well if technology cannot be developed to enable LWIVabandonment.PN02 SS3 Deep-set downhole gauge cable should not form part ofthe permanent barriers as per OGUK Section 7. It isanticipated that a rig will be required to partially abandonthis well if technology cannot be developed to enable LWIVabandonment.IN03 SS2.2 LWIV candidate for partial abandonment with cement.PN04 SS3 Deep-set downhole gauge cable should not form part ofthe permanent barriers as per OGUK Section 7. It isanticipated that a rig will be required to partially abandonthis well if technology cannot be developed to enable LWIVabandonment.PN05 SS3 Deep-set downhole gauge cable should not form part ofthe permanent barriers as per OGUK Section 7. LWIVcandidate for partial abandonment with cement.PN06 SS3 Deep-set downhole gauge cable should not form part ofthe permanent barriers as per OGUK Section 7. LWIVcandidate for partial abandonment with cement.IN07 SS2.2 LWIV candidate for partial abandonment with cement.Table 7.1 <strong>Don</strong> Wells CategorisationBarrier philosophy for isolating permeable hydrocarbon-bearing intervals will followOGUK guidelines [7.1].2.1.3 Abandonment MethodologyAbandonment of the <strong>Don</strong> wells will be divided into phases to maximise efficiency andminimise operational risk in execution. The final phase of execution will be dependent onthe well specific abandonment requirements and technical endorsement.The indicative <strong>Don</strong> wells abandonment phases are as follows: Phase 1Preparation of the wells by a Light Well Intervention Vessel (LWIV) to assess andcarry out preparatory works. If results are favourable, this may allow abandonment ofthe water injection wells (IN03, IN07) from the LWIV.Selected Removal and Disposal Options7-2 May 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!