13.07.2015 Views

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Don</strong> <strong>Field</strong> <strong>Decommissioning</strong> <strong>Programme</strong>DON-<strong>BP</strong>-001Where spans were reported in more than 1 year, only moderate change in length andheight was observed. Since buckling is an anomaly caused by pressure and temperatureeffects during operations, no further buckles or associated spans will occur.The 8in water injection pipeline has had very few spans. Spanning is not a concern onthis pipeline and there has been no requirement for remedial measures (eg rockdumping or mattressing) due to spans.None of the spans on the 8in pipelines has exceeded the FishSafe criteria of10m x 0.8m.5.3.3 Overall Burial TrendThe historical burial trend is detailed in Table 10.3. Results of these surveys indicatedthat there have been minor changes in the total length of exposed pipeline year to year,but after the remedial works, exposed areas have been extremely limited, with no trendof change or development.YearTotal Exposed LengthMetres (1) Proportion of Line (%) (2)PL598 PL599 PL598 PL5992009 267 296 1.53 (0.18) 1.7 (0.43)2002 266 253 1.49 (0.46) 1.36 (0.47)2001 245 287 1.40 (0.86) 1.65 (0.72)2000 264 – 1.52 (0.95) –1999 168 – 0.96 (0.96) –1998 248 353 1.43 (0.66) 2.03 (1.55)1997 147 143 0.84 (0.12) 0.83 (0.42)1996 242 207 1.39 (0.20) 1.20 (0.70)1995 143 207 0.82 (0.15) 1.21 (0.76)1994 196 270 1.30 (0.02) 1.57 (0.64)1993 158 225 1.00 (0.25) 1.30 (0.89)1992 183 116 1.20 (0.37) 0.68 (0.68)1991 (3) 833 355 4.80 (3.69) 2.04 (1.17)Notes: (1) Figures show length including spoolpieces.(2) Figures in brackets show the percentage of pipeline exposed excluding spoolpieces(ie after completion of remediation activities).(3) 1991 survey was performed prior to rock dump remedial work.Table 10.3 Exposure History of 8in PipelinesPipelinesMay 2011 10-21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!