13.07.2015 Views

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Don</strong> <strong>Field</strong> <strong>Decommissioning</strong> <strong>Programme</strong>DON-<strong>BP</strong>-001Section 5Inventory of MaterialsParagraphPage1 Introduction 5-12 Subsea Equipment 5-12.1 Wells 5-12.2 <strong>Don</strong> Manifold 5-13 Pipelines, Umbilicals and Jumpers 5-23.1 Pipelines and Umbilicals 5-23.2 NLGP Crossings 5-33.3 Jumpers 5-34 Materials on the Seabed 5-45 References 5-4Table5.1 <strong>Don</strong> Wells Material Inventory 5-15.2 <strong>Don</strong> Manifold Material Inventory 5-25.3 8in Production and Water Injection Pipelines, and ChemicalInjection and Control Umbilicals Material Inventory 5-25.4 NLGP Crossings Stabilisation Material Inventory 5-35.5 Flowline and Umbilical Jumpers Material Inventory 5-3May 2011Inventory of Materials5-i/ii

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!