13.07.2015 Views

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Don</strong> <strong>Field</strong> <strong>Decommissioning</strong> <strong>Programme</strong>DON-<strong>BP</strong>-001Figure 4.8 Pipelines at <strong>Don</strong> ManifoldAt Thistle, a double spoolpiece connects each pipeline to the respective risers. Pipes andumbilicals are supported by a pipebridge leading to the caisson (refer to Figure 4.9).Figure 4.9 Pipebridge at ThistleDescriptions of Items to be DecommissionedMay 2011 4-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!