13.07.2015 Views

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Don</strong> <strong>Field</strong> <strong>Decommissioning</strong> <strong>Programme</strong>DON-<strong>BP</strong>-001Section 4Descriptions of Items to be DecommissionedParagraphPage1 Introduction 4-12 Installations 4-22.1 Wells 4-22.2 Subsea Equipment 4-73 Pipelines, Flowlines and Umbilicals 4-104 Materials on the Seabed 4-124.1 Drill Cuttings 4-124.2 Other Materials 4-135 References 4-13Table4.1 Current Status of Pipelines 4-3Figure4.1 <strong>Don</strong> <strong>Field</strong> Layout 4-14.2 <strong>Don</strong> <strong>Field</strong> Pipeline Routing to Thistle 4-24.3 Typical Production Well Schematic 4-54.4 Typical Water Injection Well Schematic 4-64.5 Typical National Oilwell Xmas Tree 4-74.6 <strong>Don</strong> Manifold 4-94.7 <strong>Don</strong> <strong>Field</strong> Pipeline System Layout 4-104.8 Pipelines at <strong>Don</strong> Manifold 4-114.9 Pipebridge at Thistle 4-11May 2011Descriptions of Items to be Decommissioned4-i/ii

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!