13.07.2015 Views

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Don</strong> <strong>Field</strong> <strong>Decommissioning</strong> <strong>Programme</strong>DON-<strong>BP</strong>-001Umbilical Product Quantity (tonnes)4in control umbilical Oceanic HW540 6.93in chemical umbilical Surflo SI677 1.83in chemical umbilical Surflo 6422 1.33in chemical umbilical Surflo H356 1.13in chemical umbilical Methanol 1.3Table 9.2 Umbilical Inventories8.3 Oily DischargesProduction and water injection pipelines were cleaned of any hydrocarbon accumulation,within or adhering to the pipeline walls, as part of the pipeline cleaning and flushingoperations. The pipelines were cleaned to an oil-in-water concentration of

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!