13.07.2015 Views

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DON-<strong>BP</strong>-001<strong>Don</strong> <strong>Field</strong> <strong>Decommissioning</strong> <strong>Programme</strong>ManifoldItemWeightMaterialin Air (tonnes)Steel 48.6Aluminium-zinc-indium anodes 1.3Flowline Spoolpieces Steel 1.3Equipment Total Weight 51.2Displaced FlexiweightMattresses on/around Manifold13.2Table 5.2 <strong>Don</strong> Manifold Material InventoryStabilisation Total Weight 13.23 Pipelines, Umbilicals and Jumpers3.1 Pipelines and UmbilicalsThe material inventories for the 8in production and water injection pipelines, andchemical injection and control umbilicals are listed in Table 5.3.ItemSubsea Pipeline/Spoolpieces/Valves/WI Tee3in Chemical umbilical and 4incontrol umbilicalStabilisation (excluding NLGPcrossing)MaterialWeightin Air (tonnes)Steel 2766.0Aluminium-zinc-indium anodes 27.0Galvallum III anodes 28.0EPDM coating 373.0Concrete weight coat 43.0Composite materials 440.0Equipment Total Weight 3677.0Grout formwork/flexiweightmattresses823.2Grout bags 34.3Rock dump 4621.0Stabilisation Total Weight 5478.5Table 5.3 8in Production and Water Injection Pipelines, and Chemical Injectionand Control Umbilicals Material InventoryInventory of Materials5-2 May 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!