13.07.2015 Views

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DON-<strong>BP</strong>-001<strong>Don</strong> <strong>Field</strong> <strong>Decommissioning</strong> <strong>Programme</strong>A tie-in tee-piece, located 13.1km from Thistle, was installed for a proposed future tie-in.The tie-in tee-piece is protected by grout formwork and a protective frame attached tothe pipeline.3.9.3 3in Chemical Injection Umbilical (PL600)When the chemical injection umbilical was installed, and at certain times during itsoperation, flexiweight mattresses, grout formworks, grout bags and rock dump havebeen used to stabilise the umbilical as shown in Figure 10.18.Figure 10.18 3in Chemical Injection Umbilical Stabilisation FeaturesApproximately 2km from the <strong>Don</strong> manifold, the chemical injection umbilical crossesover the NLGP using flexiweight mattresses, grout formworks and rock dump. Refer toParagraph 3.6 for further details.3.9.4 4in Control UmbilicalWhen the control umbilical was installed, and at certain times during its operation,flexiweight mattresses, grout formworks and rock dump have been used to stabilise theumbilical as shown in Figure 10.19.Figure 10.19 4in Control Umbilical Stabilisation FeaturesApproximately 2km from the <strong>Don</strong> manifold, the control umbilical crosses over the NLGPusing flexiweight mattresses, grout formworks and rock dump. Refer to Paragraph 3.6for further details.Pipelines10-16 May 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!