13.07.2015 Views

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

Don Field Decommissioning Programme (pdf, 7.8MB) null - BP

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Don</strong> <strong>Field</strong> <strong>Decommissioning</strong> <strong>Programme</strong>DON-<strong>BP</strong>-001Fromthe <strong>Don</strong>Manifold toDECCNoDescriptionWellRefStatusThistle PL598 8in rigid pipeline N/A Filled with inhibited seawater and isolated at theThistle topsides and wellsThistle PL599 8in rigid pipeline N/A Filled with inhibited seawater and isolated at theThistle topsides and wellsThistle PL600 3in chemicalinjection umbilicalN/ABlocked and shut inThistleNotAllocated4in control umbilical N/A Subsea control inoperable. Disconnected at theThistle topsidesXmas Tree No 1 PL845 4in flexible jumper PN01 Oil production (filled with inhibited seawater andisolated at the xmas tree)4in rigid jumperIn place (disconnected at both ends)Xmas Tree No 2 PL598 4in rigid jumper PN02 Oil production (suspended and disconnected atmanifold)Xmas Tree No 3 PL599 4in flexible jumper IN03 Water injection (filled with inhibited seawater andisolated at the xmas tree)4in rigid jumperIn place (disconnected at both ends)Xmas Tree No 4 PL821 4in flexible jumper PN04 Oil production (filled with inhibited seawater andisolated at the xmas tree)Xmas Tree No 5 PL981 4in flexible jumper(refer to Note)PN05Oil production (decommissioned and recovered toshore in May 2000). Both ends (manifold andxmas tree) have been blanked off and testedXmas Tree No 6 PL1073 4in flexible jumper PN06 Oil production (suspended, filled with inhibitedseawater and isolated at the xmas tree)Xmas Tree No 6 PL1073A 1in chemicalinjection umbilicalPN06Inoperable. Umbilical disconnected at xmas treeXmas Tree No 7 PL1338 4in flexible jumper IN07 Water injection (suspended, filled with inhibitedseawater and isolated at the xmas tree)ProductionWellsNotAllocatedChemical injectionumbilicalsPN01/02/04/05Inoperable. All umbilicals disconnected at xmastreesAll WellsNotAllocatedControl umbilicalsPN01/02/04/05/06IN03/07Subsea control inoperable. PN02 and PN05jumpers removed and all other control jumpersdisconnectedNote: PL981 was decommissioned May 2000. See Appendix 10A for decommissioning correspondence with DECC.Table 10.1 List of Items to be DecommissionedPipelinesMay 2011 10-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!