72 EXCEEDING EXPECTATIONSWBI’s Civil and Infrastructure Group provided a turnkey site package for the new Ridge atHighland Creek Apartments’ 20 acre site for 13 apartment buildings and clubhouse
equired tolerances were exacting. The enormous machinesdestined to be used in the plant had to rest on extremelyflat, level foundations so that the parts could be machinedwithout vibration and within allowable tolerances. Becauseof walls that were 16 feet in height and deep excavationsthat ranged to as much as 19 feet deep, safety issues raisedconcerns for the foremen and Project Superintendent, ToddAshworth.By year’s end, WBI crews were on schedule withwork at the VC Summer Nuclear Operations Building inJenkinsville, South Carolina, on which MB Kahn was GeneralContractor. Total scope of work included foundations,foundation walls, basement walls, waterproofing,foundation drainage, backfilling, slab-on-grade andelevated slabs-on-metal deck. With Brent Hildreth asSuperintendent and Daniel Wayne as Project Manager,crews spent several months on foundation work to clearthe way for the steel erector to begin erection. More than30,000 SFCA of cast-in-place basement walls ranging from21 feet to 26 feet tall were installed within the scheduledtime. The Civil and Infrastructure Group then backfilled thewalls by placing more than 18,000 cubic yards of dirt.Daniel Wayne was also Project Manager on anotherchallenging building, the Science and Technology Buildingat Fayetteville State University in Fayetteville, NorthCarolina. Jim Forbes was Superintendent on the project,which required WBI crews to pour the foundations,foundation walls, and six exposed architectural shear walls.Each of the shear walls had its own unique geometry.Crews cast the walls, which topped out at a height of85 feet, by using a crane climbed formwork system thatallowed the forms to stay on the wall after each lift, and didnot require any formwork component to be removed untilthe walls were completed.The work at FSU also involved use of self-consolidatingconcrete (self-compacting concrete or SCC). The use ofSCC began in the 1980s and has steadily grown in theindustry. Isaiah Wayne describes it as concrete to whichchemicals are added to produce a highly-fluid concretethat does not segregate into its components. Because ofits fluidity, the mixture does not require vibration, but fillsthe forms and spreads into place, even in areas difficultto access. Depending on the project requirements, it caneven be introduced from the base of the form rather thana traditional pour from the top. Despite its fluidity, theconcrete retains its usual characteristics and durability.With the geometric architectural designs incorporated inthe formwork for the FSU shear walls, SCC was consideredto be the ideal choice for the project, and producedexcellent results on the walls. WBI also used SCC on thePerforming Arts Center at Virginia Tech and the ContinentalTire facility, among others.A very successful calendar year 2011 ended amidstplans to carry the momentum into the New Year. Thecompany began to reinvent itself by giving itself a newlook on its website and in the company newsletter. Evenbusiness cards were redesigned. A number of promisingcontracts were in the offing, and WBI found itself in need ofmore field personnel. The WBI fleet was expanded with theaddition of five trucks, two skid steers, three excavators,and two trailers. According to Alan Goodman, WBI AssetManager, the additions would benefit the field personnel,especially with hauling large equipment supplies to thegrowing number of job sites.A Turning73
- Page 3 and 4:
BY CLARENCE HORTONTHE STORY OF WAYN
- Page 5 and 6:
Four GenerationsPictured left to ri
- Page 7:
with growth, new buildings, expansi
- Page 10 and 11:
Lancaster Valley of Pennsylvania an
- Page 12 and 13:
long period of illness. She had liv
- Page 14 and 15:
Claude Delmar WayneBorn February 20
- Page 16 and 17:
The Jesse Everett Wayne family circ
- Page 19 and 20:
PiedmontCHAPTER TWOThe first major
- Page 21 and 22:
Keith and Eric as young boyson the
- Page 23 and 24:
When work was slow at the sawmill,
- Page 25 and 26:
Bobby Phillips,Eric Wayne andKeith
- Page 27 and 28:
The Waynes were fortunate to be abl
- Page 29: 350,000 sf warehouse in Rock Hill S
- Page 32 and 33: those submitted by more experienced
- Page 34 and 35: emodeled into a modern office facil
- Page 36 and 37: elieves that a recognition of chang
- Page 38 and 39: Walnut Creek Amphitheater in Raleig
- Page 40 and 41: skill level and English proficiency
- Page 42 and 43: successful both for WBI and the new
- Page 44 and 45: flatter and more level floor surfac
- Page 46 and 47: In August 1996, Isaiah Wayne, oldes
- Page 48 and 49: 40 EXCEEDING EXPECTATIONS
- Page 50 and 51: Wayne graduated from high school in
- Page 52 and 53: When interviewed for an article in
- Page 54 and 55: Executive Management Training Progr
- Page 56 and 57: employees, Matthew Surface and Milt
- Page 58 and 59: Ashton Southend Apartments located
- Page 60 and 61: NASCAR racing community and automob
- Page 62 and 63: 54 EXCEEDING EXPECTATIONSWBI’s tu
- Page 64 and 65: As work on the Premier MOB site was
- Page 67 and 68: A TurningCHAPTER FIVEAfter more tha
- Page 69 and 70: McLeod Hospital - ICU Tower100’ d
- Page 71 and 72: fast tracked project. His impressio
- Page 73 and 74: BB&T Ballpark Home Suite ShoredSlab
- Page 75 and 76: the day “when 80% of the issues t
- Page 77 and 78: Joaquin Reveles was recognized for
- Page 79: Wayne Brothers provideda turnkey si
- Page 83 and 84: Building on theCHAPTER SIXFor Shann
- Page 85 and 86: WBI’s Civil andConcrete Groupswer
- Page 87 and 88: the Winston-Salem Caterpillar plant
- Page 89 and 90: project for DPR/Fortis, a first-tim
- Page 91 and 92: Talison Row Apartments inDaniel Isl
- Page 93 and 94: Jason Sisk describes the emphasis o
- Page 95: Training on theLaser ScreedTraining
- Page 98 and 99: years.” While Mr. Ashworth agrees
- Page 100 and 101: Chad HensleyVP and Project Executiv
- Page 102 and 103: Cancer Center, the company carried
- Page 104 and 105: Cherie Berry presentedthe ABC’s G
- Page 106 and 107: Gary Akers and his team of WBI carp
- Page 108 and 109: WBI’s BB&T Ballpark crew celebrat
- Page 110 and 111: Jim ElderSenior EstimatorJim Elder
- Page 113 and 114: The NextCHAPTER EIGHTAlthough Wayne
- Page 115 and 116: Reveal of theproposed designfor WBI
- Page 117 and 118: three county area, “coming togeth
- Page 119 and 120: Curb and sidewalk construction atth
- Page 121 and 122: is also room in the large, easily-a
- Page 123 and 124: In announcing the addition of Isaia
- Page 125 and 126: Peterbuilt Dump Truck /Interstate T
- Page 127 and 128: Terrie Simone, Lacie Jones, Casey F
- Page 129 and 130: craftsmanship; a vision for the fut
- Page 132:
“Since its founding in 1985 as a