27.08.2015 Views

Contents

Construction Management Plan - Baton Rouge Department of Public ...

Construction Management Plan - Baton Rouge Department of Public ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

H&S Self-Assessment Checklist - EXCAVATIONS Page 2 of 2<br />

SECTION 1 Yes No N/A N/O<br />

EXCAVATION PROTECTIVE SYSTEMS (3.2.5)<br />

18. Protective systems used for excavations 5’ or deeper<br />

19. Protective systems for excavation deeper than 20’ designed by registered PE<br />

20. If soil unclassified, maximum allowable slope is 34 degrees<br />

21. Protective systems free from damage<br />

22. Protective system used according to manufacturer recommendations and not<br />

subjected to loads exceeding design limits<br />

23. Protective system components securely connected to prevent movement or failure<br />

24. Cave-in protection provided while entering/exiting shielding systems<br />

25. Personnel removed from shielding systems when installed, removed, or vertical<br />

movement<br />

SECTION 2<br />

Complete this section for all items checked “No” in Sections 1. Deficient items must be corrected in a timely manner.<br />

Item #<br />

Corrective Action Planned/Taken<br />

Date<br />

Corrected<br />

2.2.30<br />

Rev.0<br />

A-90 GNV310133632156.DOC/090840008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!