27.08.2015 Views

Contents

Construction Management Plan - Baton Rouge Department of Public ...

Construction Management Plan - Baton Rouge Department of Public ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Training on the actual fall protection equipment and systems to be used. This training<br />

must be documented on the Project Fall Protection Evaluation Form.<br />

• Energized Electrical Work Permit is contained in Attachment 5. This permit is to be used<br />

when work must be performed on energized electrical equipment, for specific equipment<br />

and tasks.<br />

• Project-Activity Self-Assessment Checklists are contained in Attachment 6. These<br />

checklists are to be used to assess the adequacy of CH2M HILL and subcontractor sitespecific<br />

safety requirements. The objective of the self-assessment process is to identify gaps<br />

in project safety performance, and prompt for corrective actions in addressing these gaps.<br />

Self-assessment checklists should be completed early in the project, when tasks or<br />

conditions change, or when otherwise specified by the HSM. The self-assessment<br />

checklists, including documented corrective actions, should be made part of the permanent<br />

project records, and be promptly submitted to the HSM. Subcontractors are responsible for<br />

completing confined space entry permits for their own entries.<br />

Flow Monitor Installation Activities:<br />

• Self-Assessment Checklists:<br />

o Confined Space Entry - Prior to each entry or use.<br />

• Confined Space Entry Permits: Prior to each confined space entry.<br />

• THA and SPTP: prior to each confined space entry.<br />

Construction Activities:<br />

• Self-Assessment Checklists:<br />

o Confined Space Entry, Excavations, Scaffolding - Prior to each entry or use.<br />

o Fall Protection – Prior to use when using anything besides guardrails<br />

o Earthmoving Equipment, Cranes – Initially then Quarterly.<br />

• Confined Space Entry Permits: Prior to each confined space entry.<br />

• Fall Protection Evaluation Form: Prior to using fall protection other than guardrails.<br />

• THA and SPTP: prior to each confined space entry and use of fall protection other than<br />

guardrails<br />

Project Specific Vaccines<br />

All site personnel entering confined spaces with waste and storm water must be offered Hepatitis<br />

A, B and tetanus vaccinations.<br />

A-10 GNV310133632156.DOC/090840008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!