H&S Self-Assessment Checklist - SCAFFOLDS Page 2 of 2<br />
SECTION 1 Yes No N/A N/O<br />
13. Supported scaffolds > 10 feet provided with guardrails or PFAS<br />
14. When required, adequate guardrail system installed on all platform<br />
open sides and ends<br />
15. When required, adequate PFAS provided (may also use fall protection checklist HS31)<br />
16. Falling object protection provided to personnel working on scaffolds/under scaffolds<br />
17. Safe clearance maintained from overhead power lines<br />
MOBILE SCAFFOLDS (3.2.4)<br />
18. Casters/wheels locked while scaffold used in the stationary position<br />
19. Personnel not riding mobile scaffolds unless safe to move<br />
SUSPENSION SCAFFOLDS (3.2.5)<br />
20. Suspension scaffolds and boatswains’ chairs > 10 feet provided with personal<br />
fall arrest system<br />
21. Supporting devices inspected by competent person prior to scaffold use<br />
22. Suspension ropes inspected by competent person before each work shift<br />
23. Damaged or repaired wire rope not used as suspension rope<br />
24. Suspension ropes joined together only by eye splice thimbles connected by shackles<br />
25. Wire rope clips inspected/retightened after initial loading and before each work shift<br />
26. Scaffold ropes protected from welding, heat, and corrosives<br />
27. Scaffolds tied or otherwise secured from swaying<br />
ADJUSTABLE SUSPENSION SCAFFOLDS (3.2.6)<br />
28. Adjustable suspension scaffolds > 10 feet provided with guardrails and PFAS<br />
29. Hoists have braking device/locking pawl that engages during scaffold<br />
uncontrolled movements<br />
30. Manually operated hoists require positive crank force to lower<br />
31. Gasoline-powered hoists not used<br />
SECTION 2<br />
Complete this section for all items checked “No” in Section 1. Deficient items must be corrected in a timely manner.<br />
Date<br />
Item #<br />
Corrective Action Planned/Taken<br />
Corrected<br />
A-96 GNV310133632156.DOC/090840008