SECTION 9.0 CONSTRUCTION QA/QC PROGRAM<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Shop Drawings<br />
Work Schedules<br />
Reports/Statements<br />
Material or Product cut sheets or other descriptions<br />
Materials Samples<br />
Materials Testing<br />
Contractor’s Safety and Health Plan<br />
<br />
<br />
The primary responsibility for overall management and control of submittals lies with<br />
the Contractor.<br />
Submittals shall be provided in a timely manner, and according to Contract Documents,<br />
to allow for the review, approval, procurement, delivery, and QC preparatory phase of<br />
an item before it is needed for construction. The Contractor will receive no time<br />
extension for delays caused by late or deficient submittals which require multiple<br />
submissions. If a Contractor repeatedly provides deficient submittals, C-P/DPW<br />
reserves the right to back charge the cost of multiple reviews.<br />
9.8 Testing<br />
Testing procedures described in the Construction Contract Documents are another form of<br />
quality control to be performed by the Contractor, ensuring delivery of an end product<br />
which meets the requirements in the contract.<br />
Testing requirements and procedures shall include but not be limited to the following:<br />
<br />
<br />
<br />
<br />
An outline of proposed testing procedures developed and submitted prior to<br />
construction.<br />
A listing of required tests as specified in the Contract Documents, in addition to<br />
providing a listing of non-specified testing procedures pending approvals.<br />
Identification of tests to be performed by an independent, C-P/DPW approved certified<br />
testing laboratory or by the Contractor with C-P/DPW approved certified equipment<br />
and procedures or by others (subcontractors or suppliers) approved by C-P/DPW.<br />
ASTM 3740-96, Minimum Requirement for Agencies Engaged in the Testing and/or<br />
Inspection of Soil and Rock as used in Engineering Design and Construction.<br />
9.9 Quality Assurance<br />
Quality Assurance (QA) is the means by which C-P/DPW ensures the completed project<br />
complies with the quality established by the Contract Documents. C-P/DPW ensures that<br />
Quality Control (QC) will be accomplished through reviews, observation and tests by QA<br />
personnel (Field Inspector, Design Engineer, Construction Management Team or any other<br />
authorized C-P/DPW representative).<br />
Responsibilities of the QA personnel include but are not limited to the following:<br />
<br />
Respond to Contractor’s RFIs in a clear and timely manner.<br />
GNV310133632155.DOC/090840001 9-5